Our group V. Bougatsos SA materialized the recent renovation of all refrigeration systems for PAVLIDIS chocolate factory in Greece member of KRAFT FOODS Group.
Project overview:
- New refrigeration systems for production and packing area air-conditioning 20oC and RH 45%, total refrigeration capacity 700kW, environmental friendly refrigerant R-134a
- New refrigeration systems for cooling tunnels and enrobing machines , total refrigeration capacity 250kW, environmental friendly refrigerant R-507a
- Chilled water +10oC production and supply for tempering machines, total cooling capacity 235kW
- Ventilation with fresh air in the production
- New air-conditioning systems for the administration offices and the utility areas.
The project was accomplished with total success and it achieved: 37- 42 % greater cooling capacity with 15% lower energy consumption compared to the old systems.Greater cooling capacity facilitated the cooling tunnels and leaded into significant production rise 35-40%.
Project execution year: 2010