Astra Zeneca Pharmaceuticals central warehouses occupy a building of 2,500sq.m. with 11m height located at Aspropyrgos, Attica Greece.
The objective of the project was the implementation of stable temperature and relative humidity conditions in the entire volume of the building with very limited fluctuations: ±1oC for temperature and ±3% for relative humidity.
The project also included:
• Proper ventilation with clean-filtered air 15 air changes/hour
• Non-stop conditions monitoring and recording performed by thirty (30) recorders (±0.3% accuracy)
• Cold rooms +4oC for preservation of special medicines.
• Office areas air-conditioning , 850 sq.m. and special air conditioning for the computer room
• Central SCADA system and tele-monitoring of all building facilities.
Project Execution Year: 2005